UMBC CMSC 104 |
Another Stern Warning: The dates are tentative. Changes can and probably will occur! This is only offered as a guide. Additionally, some of lecture notes will change and I will indicate which ones with a "new symbol" -> I will also put the date of the change after the symbol.
# 0501/0601 | TOPIC | L# | NOTES | DUE |
---|---|---|---|---|
1 Jan 27/Jan28 |
Introduction to CMSC 104 & Preliminaries | L01 | ||
2 Jan 29/Feb 2 |
Prelimaries | L01 | ||
3 3 Feb/4 Feb |
Architecture & Number Systems | L02 | ||
4 5 Feb/9 Feb |
Introduction to C | L07 | Assign Project 0 | |
5 10 Feb/11 Feb |
Operating Systems | L03 | P0 | |
6 12 Feb/16 Feb |
Variables | L08 | Assign Project 1 | |
7 17 Feb/18 Feb |
Algorithms Part I | L04 | ||
8 19 Feb/23 Feb |
Algorithms Part II
|
L05 | P1 | |
9 24 Feb/25 Feb |
Test | L01-L05, L07-L08 | ||
10 26 Feb/1 Mar |
SDLC | L06a | ||
11 2 Mar/3 Mar |
Algorithms Part III | L6 | ||
12 4 Mar/8 Mar |
Arithmetic Operations | L9 | ||
13 9 Mar/10 Mar |
Relational And Logical Operations | L10 | ||
14 11 Mar/15 Mar |
While Loops | L11 | Assign Project 2 | |
15 16 Mar/17 Mar |
More Loops | L12 | ||
16 18 Mar/29 Mar |
Assignment Operators | L13 | P2 | |
17 1 Apr/5 Apr |
Switch Statement | L14 | ||
18 6 Apr/7 Apr |
Midterm Exam | L1-L13 | Bring photo ID | |
19 8 Apr/12 Apr |
Incremental Programming | L15 | Assign Project 3 | |
20 13 Apr/14 Apr |
Top-Down Design | L16 | ||
21 15 Apr/19 Apr |
Functions Part I | L17 | P3 | |
22 20 Apr/21 Apr |
Functions Part II | L18 | ||
23 22 Apr/26 Apr |
Functions Part III | L19 | Assign Project 4 | |
24 27 Apr/28 Apr |
Arrays Part I | L20 | ||
25 29 Apr/3 May |
Test | L14-19 | P4 | |
26 4 May/5 May |
Arrays Part II | L21 | Assign Project 5 | |
27 6 May/10 May |
Searching and Sorting | L22 | Assign Extra Credit Project | p5 |
28 TBA |
Final Exam | All material | Bring photo ID | EXC |
All projects are to be submitted to the digital dropbox by 11:59 p.m. of the day due. (As long as the date/time stamp is for the day due, it is on time.)